Skip to content

Musée de l’Armée, Hôtel national des Invalides – Paris

Paris 7th

Musée de l'Armée, Hôtel national des Invalides - Paris
Location
Musée de l’Armée
Hôtel national des Invalides – Paris
Contract scope
Programming study for the extension of the Musée de l’Armée
Completion
Ongoing
Area
17,000 m2
Client
OPPIC – Musée de l’Armée
Client advisory / Programming
Architect: Chiara Alessio
Structural engineering: Structure et Patrimoine
MEP engineering: INEX
Cost consultant: Cabinet Philippe Grandfils
Preventive conservation: Cartel Collections
Scope
Architectural, museographic and technical programming study

Set in the heart of the Hôtel des Invalides, a jewel of classical architecture, the Musée de l’Armée holds one of the richest collections of military history and offers a busy cultural programme all year round: temporary exhibitions, concerts, films and lectures. It also welcomes researchers to its library. Its spaces, extraordinary for their historical, heritage and highly symbolic character, also make it a prime venue for events, including state ceremonies.

As new spaces became available within the Hôtel des Invalides, an extension of the museum was planned, with the aim of enlarging the museum route and telling the story of new historical periods: the history of colonisation and decolonisation – military history from 1945 to the Cold War – the present day.

For a project of such exceptional scale, the museum wished to offer a combined view of military history and the history of the Hôtel des Invalides. The challenge of the study was therefore to bring the historic architecture into dialogue with its contemporary museum functions, while respecting the heritage character of the site.

The in-depth feasibility study, which proposed several redevelopment scenarios, led to a coherent museum route within the building. Drawing on a multidisciplinary team specialised in major refurbishments of historic buildings, it set realistic objectives for preventive conservation, structure and museography, weighing the impact of each scenario on costs, objectives and resources.

As the extension is to be carried out in two phases – the first planned for 2024, the second by 2030 – the brief was conceived as a whole, so that the scientific and cultural project is implemented consistently over time and space. The brief naturally took into account the need to keep the site open during the works.

Musée de l'Armée, Hôtel national des Invalides - Paris

Photographs: Paris – Musée de l’Armée, Dist. RMN-Grand Palais – © Anne-Sylvaine Marre-Noël